Component I: Creation INTRODUCTION
1. Commodity Description: Cold drawn ERW metal tube, also named DOM tubing, is a sort of drawn more than mandrel welded metal tube. This kind of tube has ideal surface condition,concentricity,and large tensile power.
2. Commodity: EN 10305-2 E355 cold drawn welded metal tube
three. Measurement variety: 70mm*2mm-325mm*15mm
4. CZPT specification&steel grade:
ASTM/ASME: | ASTM A512 MT1571,MT1571 |
EN: | EN10305-two E195, E235,E355 |
5. Manufacture technique: hydraulic cold drawn
6. Shipping condition:
BK | BKW | BKS | GBK | NBK |
+C | +LC | +SR | +A | +N |
Chilly rolled | Cold drawn | Stress relieved | Annealed | Normalized |
seven. Conclude finish: simple ends with square cuts,free of burrs.
8. Marking: as for every request
nine. CZPT export packing: in bundles tied with steel strips. Int&ext oil coating. External packing by PVC luggage and knit luggage.
ten. CZPTized packing and marking are CZPT on ask for.
Chilly DRAWN ERW Metal TUBES: OIL Painting FOR ANTI-RUST Safety
Cold DRAWN ERW Steel TUBES: PACKING
Element II: Usually Questioned Queries
one. MOQ: CZPTly, Min Get Quantity can be 1 ton/measurement.
2. Delivery Time: CZPTly, our shipping and delivery time is around 20-35 days dependent on availability of uncooked content.
3. Warranty&Ensure: Warranty&promise time period is 6 months given that we produce the tubes, and we are not accountable for top quality issue induced by mistaken unloading or storage following shipment. We welcome customer’s inspection prior to cargo.
4. Payment Technique: We acknowledge payment technique like T/T, L/C, or D/P, but it relies upon on our investigation about consumers. We have a solution to assess the credit of buyers from all more than the planet, and time and volume of D/P we can launch is identified by the analysis.
five. Quality Control: ninety% of the tubes are created from hot rolled seamless pipes. So, top quality of uncooked substance determined good quality of completed tubes. We purchase raw materials from secure suppliers who are foremost metal mills, and we inspect the raw materials as per the technical specs. During our production process, there is inspection and good quality manage in each and every stage.
Element III: Company INTRODUCTION
We are a manufacturer of cold drawn, chilly rolled, and hydraulic chilly drawn metal tubes with OD upto 356mm since 2002. Covering an region of about 32000M2, we have twelve standard workshops with two hydraulic cold drawing benches, four chain cold drawing benches, and two ERW mills. Our facilities addresses all the creation techniques from pickling, cold drawing,heat dealing with,saw chopping, straightening,inspection,packing to additional machining &turning, cold drawing die fabrication, and equipment repairation&routine maintenance.
Manufacturing facility Physical appearance:
Uncooked Content Stock:
Chilly DRAWING DIE WAREHOUSE:
HYDRAULIC Chilly DRAWING:
MULTI-ROLLER SRAIGHTENING:
STRAIGHTENING BY Push:
Noticed Cutting:
LATHES:
HONING: