Yuchen electrical power tramsmission offer you all the sprocket
Merchandise Description
1. American CZPT, CZPTpean CZPT, Japanese CZPT
two. Pilot bore, finished bore, taper bore and specific bore CZPT
three. CZPT surface area and high precision
four. Advanced warmth treatment and floor treatment crafts
5. Far better high quality and competitive price tag.
6. Substance C45(1045), minimal carbon metal, 40Cr, 20CrMnTi, stainless steel this kind of as SS316L, SS316, SS304, SS420, copper and many others. CZPT
7. CZPT sea worthy package to CZPTpe and American
eight. High pace digital equipment hobbing machines to ensure the teeths quality
9. Corrosion resistance remedy CZPT
10. Manage on tolerance and effortless to put in
eleven. Great materials and good treatment to make sure prolonged life span
12. OEM/ODM welcome
Solution demonstrate
Manufacture approach
Company sort | Manufacturer & Exporter |
Main export marketplace | CZPTpe, North and South The us, Southeast Asia, CZPTia, Middle East, Africa |
Substance | C45, lower carbon steel, 40Cr, solid iron, stainless metal, copper etc |
Production technique | Cast and then machined, hobbed, if need can also weld |
Heat treatment method | Large frequency quenching and so on |
Surface treatment | Oxide black, Galvanized, Nickel plated, Chrome plated, Sandblasting, Painted and so on |
Model | Variety A & Kind B, Single, CZPT, Triple – 35B10-eighty,40B9-90,50B9-90,60B9-ninety,80B9-90,100B9-ninety,120B9-80,140B10-60,160B10-6006B10-one hundred twenty five,08B9-125,10B9-125,12B9-one hundred twenty five,16B9-one hundred twenty five,20B9-114,24B9-90,28B9-seventy six,32B9-76, and other sprocket to match with conveyor chain, transmission chain |
Packing | Plywood Scenario/Pallet |
FAQ
Q: Are you buying and selling organization or company ?
A: We are factory.
Q: How long is your supply time?
A: CZPTly it is 5-10 days if the products are in inventory. or it is fifteen-twenty times if the products are not in stock, it is in accordance to quantity.
Q: Do you give samples ? is it free of charge or added ?
A: Sure, we could offer you the sample for cost-free cost but do not spend the expense of freight.
Q: What is your terms of payment ?
A: Payment 30%TT in advance. 70% T/T prior to shippment